our values and vaulted us to the top of our industry.
The total project value was $12 million for this cutting-edge new facility. The new Southern Illinois University Health Services Facility is the largest student health facility in the nation with over 64,000 square feet.
The Design Build Team battled the winter while constructing the 22,000 SF Concrete Tilt Structure that Black Diamond Harley Davidson needed due to their increase in sales, the owners of Black Diamond needed an additional warehouse area to assemble bikes and house trade-in vehicles.
To accommodate one of the regions fastest growing businesses, Zeller Construction was the Design Build Contractor for this $1.6 million branch facility. The Design-Build Team completed this Tilt-Up concrete construction project in just over 7 months.
As the design/build contractor for this $2 million automobile dealership, Zeller worked closely with the owner to accomplish the standard building appearance desired by Ford Motor Company. Zeller designed, permitted, and constructed this facility over a nine month period.
Zeller Construction was chosen to be the general contractor on this $3.8 Million addition and historical restoration project. Great care was taken in the restoration of details of this project. Zeller delivered this historical project in 11 months.
Zeller Construction was the design / build contractor for this $2.2 million Budweiser distribution center. Zeller provided over $75k in value engineering savings and delivered the project to the owners in 7 months.
We successfully cope with tasks of varying complexity, provide long-term guarantees and regularly master new technologies.
(+380) 50 318 47 07
65 Allerton Street 901 N Pitt Str, Suite 170, VA 22314, USA